Monday, November 21, 2011

Tunnel Under Diamond Drive


After surrounding walls were engineered to slow flash floods and prevent erosion, the tunnel under the landfill bridge was widened to allow water to pass through without damaging Diamond Drive above.

No comments:

Post a Comment